Consolidate Fleet Diving Unit (Pacific)

Project Type

Project New/Replace

Objective

The aim of the FDU(P) Consolidation project is to replace the majority of the existing 43 FDU(P) terrestrial facilities and the entire marine infrastructure with three modern buildings and a new floating jetty. This will provide modern, dafe, functionally-suitable and sustainable facilities to support the current and future operations of FDU(P).

Requirements

The process mapping exercise conducted by the project Prime Consultant initially determined that the minimum military requirement is 7,240 m2 gross for inside space as reflected in this SOR(I). In consultation with the Prime Consultant and FDU(P), this gross area has been value-engineered to reduce cost and further refinements will occur during the detailed design stage of the project.

Funding Range

$250 million to $499 million

Anticipated Timeline (Fiscal Year)

Options Analysis Phase
In Progress
Start Definition
To be determined
Start Implementation
To be determined
Initial Delivery
To be determined
Final Delivery
2029/2030

Defence Capability Areas

Defence Capability Investment Areas

Key Industrial Capabilities

Contact Us

Do you have any questions or comments about the Defence Capabilities Blueprint? The DCB is managed by the Directorate of Capability Integration at National Defence. To help us connect you with the appropriate subject matter or technical expert, please select whether your query is related to the DCB in general, is related to a project, or if you require technical support. If you request follow up, we will endeavour to acknowledge your request within 7 working days.

Page details

Date modified: